LifeOS/_institute/decision-log.md

580 B

Institute Decision Log

Timestamped decisions about the team, vault structure, and coordination.

2026-09-07 — Pilot foundation

  • Pilot cohort: Clara (research), Dexter (engineer), Doc (mentor); scale to 8 after the loop is proven.
  • Vault organized by life-domain, not worker. Agents are workers on shared projects.
  • Binaries (meshes, checkpoints, renders) are gitignored; git tracks knowledge + code.
  • Oversight = Eleanor + the Kanban board; no separate HR meta-agent.
  • Surface = WebUI avatar chips; Forgejo (Phase B) = remote sync + web view + backup; git over SSH.